Vertical Solution
Multi-Staged
TODO TODO
Summary
Asset: British Steel Plant
Benefits:
Engineering: 2kN/m2 UDL
Scope: Maintenance works
Location: Various locations including BOS tank
Operator:
Description
V-Deck™ was required for a variety of work scopes within British Steel assets to replace all scaffolding on site wherever possible. V-Deck™ was used for access to vertical pipe work and in the BOS Vessel casting pot.
V-Deck
by Velo Tech Systems Ltd
Copyright © 2026 Velo Tech Systems Ltd.
All rights reserved